Graz, Austria
Delivery: 2000-2001
The new Cityrunner for the Grazer Stadtwerke AG -Verkehrsbetriebe. The 18 low-floor articulated light rail vehicles will be delivered in 2001 and in the mechanical part manufactured by Bombardier Transportation, Vienna.
The electrical equipment has been projected by Vossloh Kiepe, Vienna. The traction equipment for the wheel hub motors, the static convertors and the setpoint generators are delivered by Vossloh Kiepe, Düsseldorf.